Process
Seven stages, in the same order, every time.
The sequence below is not a marketing device — it is the order in which the information becomes available. Skipping a stage does not save time; it moves the cost to the end of the project, where it is most expensive.
Brief
Objectives, lifestyle, scope and budget agreed before a single line is drawn.
- Objectives set against the architecture, the environment and how you actually live
- Scope agreed room by room, with a budget that survives contact with reality
- A written programme, so nobody discovers a misunderstanding in month four
You receive
A scope and budget agreement, and a room-by-room programme.
Survey
Existing conditions measured and photographed; architectural constraints logged.
- Measured survey of existing conditions — the numbers everything downstream depends on
- Photography of the space as found, including the parts nobody photographs
- Daylight and orientation study: where light lands, and which corner never gets any
You receive
A measured survey, existing-conditions photography and a daylight study.

Concept
Direction set through palette, material and reference — the argument for the scheme.
- A direction argued through palette, material and reference rather than adjectives
- Physical samples: textiles, stone, timber, metal — seen in your light, not a showroom's
- The rationale written down, so a decision made in week two can be defended in week twenty
You receive
Concept boards, a material and finish palette, and a sample set.

Space Planning
Circulation, zoning and furniture layouts resolved against the architecture.
- Circulation and zoning resolved against the architecture, not against a mood board
- Furniture layouts drawn to scale, with clearances checked rather than assumed
- Elevations where the vertical dimension is doing work — joinery, hearths, art walls
You receive
Furniture floor plans, circulation studies and elevations.
Specification
Every piece scheduled: dimension, finish, textile, lead time, price.
- Every piece scheduled: dimension, finish, textile grade, lead time and price
- Performance criteria set where life demands them — children, dogs, sun, salt air
- An access survey, because a sofa that will not go up the stair is not specified
You receive
A full FF&E schedule, sample set, lead-time programme and pricing pack.

Visualisation
Photoreal renderings so the client approves the room, not a mood.
- Photoreal renderings of the principal rooms, produced before anything is ordered
- Alternatives tested in the model, where moving a sofa costs nothing
- Sign-off on the actual room rather than an impression of it
You receive
Rendered views of each principal room, revised until approved.

Installation
Delivery sequenced, site supervised, rooms styled and photographed.
- Delivery consolidated and sequenced, largest pieces first, floors protected throughout
- Site supervised on the day — someone answerable present while it happens
- Rooms styled and photographed on completion, then handed over with the documentation
You receive
A delivery programme, supervised installation, final styling and a handover pack.

See the process applied, project by project.